Montgomery Road Multi-Use Path Extension (Middlebury Drive To IL Route
Study Background
The City has attained federal funding (both Local Rail-Highway Crossing Safety Program Funds and Illinois Transportation Enhancement Program (ITEP) Funds) to construct a Multi-Use Path along Montgomery Road. To qualify for the federal funding, the City is preparing studies in accordance with the National Environmental Policy Act (NEPA) and in accordance with Illinois Department of Transportation (IDOT) Bureau of Local Roads & Streets (BLRS) policies and procedures.
Purpose of Project
The purpose of the project is to improve safety along the Montgomery Road corridor and continue fulfilling the City’s commitment to bicycle users and pedestrians as described in the City’s Bicycle and Pedestrian Plan. Upon completion of these projects, the City’s Montgomery Rd Bikeway will be completed. The path will allow for safer non-motorized travel and will be ADA compliant along its length and at all intersections.
Proposed Improvements
The project will consist of installing a new 8’-wide asphalt path along Montgomery Rd including ADA accessible crossings at all intersections. Preliminary Engineering work is being completed and funded under 2 separate projects, which will be combined into 1 project for Design Engineering and beyond:
- The mainline path project involves all work with the exception of the CN railroad crossing near Normantown Rd and is being funded with ITEP funds.
- The CN railroad crossing project involves the work to provide a safe crossing of the CN railroad tracks including pedestrian gates and flashers and is being funded with Railroad Crossing Safety funds.
Schedule
The project is scheduled to begin construction in 2026, pending funding availability and the acquisition of the right-of-way necessary to construct the improvements.
Public Information Meeting
An open house public information meeting was held from 5:00 to 7:00 PM on Thursday, September 7, 2023 at the Aurora Fire Station #8, 3770 McCoy Drive, Aurora, IL, 60504.The purpose of the Public Information Meeting was to present the purpose and need for the projects, the proposed improvements, findings of the environmental studies, anticipated property impacts, and obtain public input. There was a single combined meeting to discuss the path and railroad crossing projects at the same time. We encourage comments throughout the course of the study. Questions or comments that were received by September 21, 2023 were added to the public meeting record.
Contact Information
Tim Weidner, P.E., Engineering Coordinator
Public Works - Engineering
Physical Address: 2185 Liberty Street, Aurora, IL 60502
Phone Number: 630-256-3200
Email: WeidnerT@aurora.il.us
Office Hours
Monday - Friday
8 A.M. to 5 P.M.